SAP Available Check (ATP) and the Scope of Check

Available To Promise (ATP) and the Scope of Check

This post aims to describe the various components that are included, or excluded, from the ATP check based on the rules defined in the scope of check.  A number of these options are fairly self explanatory, but some of them have caveats, behave differently based on other configuration choices, or are less than intuitive.  Hopefully this guide helps others in their review of ATP configuration.

Examples of the MRP Elements that are impacted by each option and examples of transactions that generate or modify the MRP Elements are included.  The screenshot below is an example of a standard SAP Availability Check for sales orders.


The documentation that follows is based on my own experience, testing in an ECC 6 environment, and with some assistance from the SAP Support Portal.  Some useful references are provided at the bottom of this document.

Stocks

All of the options in this area have the ability to impact the general stock quantity that is used to represent the current stock level at the plan and at the storage location level.  In addition the Incl.quality insp. Stock and W/o subcontracting options can also impact the MRP elements that are taken into account for availability.

Include safety stock

This option prevents the subtraction of safety stock from available inventory.  In the example above Safety Stock would be checked. With this option checked the Stock Line in CO09 should match the Stock Line in MD04. With it un-checked the Stock Line in CO09 should be the result of subtracting Safety Stock from current stock.

MRP Elements Impacted: None

StockIn Transfer

Stock in transfer should not be confused with stock in transit, that is used in the two step Stock Transfer Order process involving a Stock Transfer PO, Outbound Delivery, and subsequent goods receipt.  StockIn Transfer only applies to stock put into an in transit status, such as with a manual 313 goods movement to place stock in transit between two storage locations or a 303 to place stock in transit between two plants.  With this box checked the quantity in transit is added to the stock line of the destination plant or storage location.  Without this checked the stock in transit is completely unavailable and ignored, both at the sending and receiving locations.

MRP Elements Impacted: None

Related Transactions: MIGO, MB1B

Incl.quality insp. Stock

For QM managed materials this will include Quality Inspection lots, maintained through transaction QA02, and will show the lot as available inventory on the Inspection End Date for the lot.  Each lot is separately listed with its MRP Element.

For materials that are not QM managed this will include stock that is posted into Quality Inspection Stock.  Quality inspection stock can be posted to manually through transaction like MB1C using standard movement types 503, 523, or 563.  Quality inspection stock is included as part of the total stock line that is available.

MRP Elements Impacted: QM-Lot

Related Transactions: QA01, QA02, QA03

Include blocked stock

Includes stock that is in a block status, such as stock that is posted into Blocked Stock using movement type 505.  This inventory is represented as part of the total stock.  This does not impact material that is received into Goods Receipt Blocked Stock, such as material received with movement type 103.  Material Received into Goods Receipt Blocked Stock will continue to display as a POItem.

MRP Elements impacted: None

Related Transactions: MIGO, MB1C

Include restricted Use Stock

Applies to batch inventory when batch status management is active.  When this flag is checked then batches that have a restricted status are included along with the unrestricted.

MRP Elements impacted: None

W/o subcontracting

With this flag checked stock provided to vendor is removed from the availability check.  This also removes and requirements that the subcontracting process may place on component plant inventory, meaning that SubReq MRP Elements will not be reflected in Demand, this would have the greatest impact on a material that was both a subcontracting component for one process and itself a subcontracted material.

This will not impact the inclusion of the POitem or PurRqs elements related to a subcontracting PO being placed with a vendor.

MRP Elements impacted: SubReq

Replenishment Lead Time

Check without RLT

When unchecked then the system will calculate the replenishment lead time for the material.  When replenishment lead time is active only requirements that fall within the lead time are considered and everything that falls outside of RLT automatically confirms.

Replenishment lead time is calculated differently for externally procured material and produced material, which is determined based on the Procurement Type of the material.  Materials with a procurement type of X are treated as produced materials for RLT purposes.

Externally Procured Material

There are three key fields that are used in determining the RLT for a purchased material.

  1. Purchasing Processing Time
    This is a configured value and assigned to the plant MRP settings through OPPQ. This duration is checked against the factory calendar and applies only to work days.
  2. Planned Delivery Time
    This value comes from the Material Master MRP 2 view and is applied without regard to the factory calendar.
  3. GR Processing Time
    This value comes from the material master MRP2 view and is checked against the factory calendar, only being applied to work days.

The example below represents a material at a plant with 1 day of Purchasing Processing time, 30 days of Planned Delivery Time and 2 days of GR Processing Time.  The factory calendar for the plant is show to the right, with dates in green being non-working days.


Produced Material

There are two different methods for calculating the RLT for produced materials.  When the Total Replenishment Lead Time in the MRP 2 view is populated then this is the value that is used.  If this value is empty then SAP checks the Production Time, which is a combination of the In House Production Time and GR Processing Time from the MRP 2 view of the material master. Both of these methods use the factory calendar and are applied only to work days.

The following example is for a material with Total Replenishment lead time maintained and a factory calendar that doesn’t include weekends.  The Total Replenishment lead time is 20 days.



Storage Location Inspection

No storage location inspection

When the storage location is specified in a transaction then it is ignored when performing the ATP check.  This means that if a plant has 100 EA of inventory in storage location A001, and a delivery is created for 100 EA but specifying storage location WM01, then the ATP check will still be successful without storage location inspection.

In/outward movements

Incl.purchase orders

There are three options when including purchase orders, which include all forms of purchase orders, such as purchases from vendors, stock transfer orders, and inter-company stock transfers, and returns to vendor.  These options only apply to the receiving quantities for purchase orders.  The outbound requirements for stock transfers are controlled through the Incl.rel.order reqs option.

This option controls the inclusion or exclusion of the POitem MRP Element and the ShpgNt MRP Element.  When purchase orders are included the ShpgNt is always considered, no matter which option is chosen in the Incl.ship.notificat. option.

Related Transactions: ME21N, ME22N

MRP Element: POitem, ShpgNt, Return

Blank – Do not check

Inbound quantities from Purchase Orders are ignored.

X – Check

Include purchase orders in available inventory.

X works like A if the STO configuration in Purchasing à Purchase Order à Set Up Stock Transfer Order à Assign Delivery Type and Checking Rule is set up for the PO Type and Plant to have the ATP Conf. MRP flag checked or if the Fix Date / Quantity flag is checked in the PO line item.

Availability Date: Delivery Date from PO Line Item + GR Processing Time.  GR processing time is calculated based on the factory calendar.

If an inbound delivery / shipping confirmation has been applied to the PO Item then Delivery Date is taken from this confirmed date and then the GR processing time is added.  This is reflected by the MRP Element changing from a POitem to a ShpgNt.  Shipping Notifications are always recognized for POs when POs are checked, regardless of the subsequent Incl.ship.notificat. option.

A – Check Purch.Orders (If Stock Trans.Ord.:Check Confirmed Qty)

Include purchase orders in available inventory.

Availability Date: Delivery Date from PO Line Item + GR Processing Time.  GR processing time is calculated based on the factory calendar.

For STOs each Schedule Line is included on its confirmed date with its confirmed quantity.  The GR processing time is added to each of these dates.

If an inbound delivery / shipping confirmation has been applied to the PO Item then Delivery Date is taken from this confirmed date and then the GR processing time is added.  This is reflected by the MRP Element changing from a POitem to a ShpgNt.  Shipping Notifications are always recognized for POs when POs are checked, regardless of the subsequent Incl.ship.notificat. option.

Incl. purch.requistions

Include Purchase Requisitions in availability check.

Availability Date: Delivery Date from PO Line Item + GR Processing Time.

Related Transactions: ME51N, ME52N

MRP Elements: PurRqs

Incl. dependent reqs

Includes the dependent requirements generated by the component demand of planned orders.  These requirements are included for all planned orders, regardless of being MRP generated, Component Checked, or Capacity Scheduled.

Requirement Date: Start Date of the planned order

MRP Elements: DepReq

Include reservations

This is not to be confused with Production Order Component reservations, which controlled by the Incl.depen.reservat. option.

This option will include demand from reservations made through transaction MB21.

Availability Date: Base date of the reservation.

MRP Element: MtlRes

Include Sales Reqmnts

Includes demand generated from Sales Orders, Scheduling Agreements and other types of SD documents that are configured for requirements, depending on configuration this could include Inquiries and Quotes.

MRP Elements: CusOrd, SchAgr

Related Transactions: VA01, VA02, VA31, VA32

Include Deliveries

This option is specific to SD deliveries and does not impact outbound STO deliveries or inbound purchasing related deliveries. This option will place a requirement on the material availability date of the delivery line.

MRP Elements: Delvry

Related Transactions: VL01n, VL02N, VL10G, VL10A

Incl.ship.notificat.

This option is only relevant if the Incl.purchase orders option is blank.  This option will only include Purchase Orders that have a shipping confirmation.  If the Incl.purchase orders option is set to either A or X then Shipment Notifications are always taken into consideration, regardless of this setting.

MRP Elements: ShpgNt

Related Transactions: ME22N

Incl.depen.reservat.

This option will include component requirements for Production Orders.  There are notes from SAP regarding this option and its applicability to purchase orders.  I have only used this option to manage reservations related to Production Order components.

MRP Elements: OrdRes

Related Transactions: CO01, CO02

A – Only include withdrawable reservations

This option will only include requirements related to release Production Orders.  Order Reservations for production orders that are not yet released will not be considered.

X – Include all reservations

This option will include all production order reservations.

Incl.rel.order reqs

This option is to include the demand for the supplying plant of stock transfers, either related to purchase reqs or purchase orders.

A – Check releases for stock transport orders only

Only include Stock Transfer Purchase Order requirements at the supplying plant.

MRP Elements: Ord.DS

X – Check releases for stock transport orders and requisitions

Include both Purchase Requisitions and Purchase Order stock transfer requirements at the supplying plant.

MRP Elements: Ord.DS, PRqRel

Transactions: ME51N, ME52N, ME21N, ME22N

Incl. planned orders

This option includes the receipts from Planned Orders.  This option should be carefully considered as planned orders are often created automatically by the MRP process.

MRP Elements: PldOrd

Transactions: MD11, MD12, MD01

X – Check all planned orders

Includes all planned orders, MRP Generated, manually created, firmed, confirmed, or capacity planned.

A – Check firmed planned orders only

Only include planned orders with the Plnd order flag checked in the Firming section.

B – Only check planned orders that are completely confirmed

Only include planned orders that have been availability checked in order to confirm component availability.

Incl. production orders

This option includes planned receipts from production orders.

MRP Elements: PrdOrd

Transactions: CO01, CO02

X – Take all production orders into account

This option will include all open production orders

F – Only take released production orders into account

This option will only include receipts for open production orders that have been released for production.

Receipts in past

The Receipts in past option impacts all receipt related ( inventory additive ) MRP Elements.

MRP Elements: PrdOrd, PldOrd, ShpgNt, POitem, PurRqs, QM-lot

Include receipts from past and future

This option takes into account all planned receipts, based on the other options that are chosen, regardless of the date of the planned receipt.

A – Include receipts from past and future, with messages

This option takes into account all planned receipts, based on the other options that are chosen, regardless of the date of the planned receipt. A message is presented to the user when the ATP check includes planned receipts that were supposed to have already occurred.

B – Include future receipts only

This option excludes all planned receipts with a date that falls in the past and includes all receipts where there is a current or future date.

C – Include future receipts only, with a message

This option excludes all planned receipts with a date that falls in the past and includes all receipts where there is a current or future date.  A message is presented to the user when the ATP check includes planned receipts that are planned for the future.


Copied

2019/04/07

About SAP




1)   About :
When Xerox exited the computer hardware manufacturing industry in 1971, it asked IBM to migrate its business systems to IBM technology, As part of IBM's compensation for the migration, IBM was given the rights to the Scientific Data Systems (SDS)/SAPE software, reportedly for a contract credit of $80,000.
Five IBM engineers from the AI department
- Dietmar Hopp
- Klaus Tschira
- Hans-Werner Hector
- Hasso Plattner
- Claus Wellenreuther
All from Mannheim, Baden-Württemberg were working in an enterprise-wide system based on this software, only to be told that it would no longer be necessary. Rather than abandoning the project, they decided to leave IBM Tech and start another company.
In June 1972, they founded the SAP Systemanalyse und Programmentwicklung
("System Analysis and Program Development" / "SAPD") company as a private partnership under the German Civil Code.
Their first client was the German branch of Imperial Chemical Industries in Östringen, where they developed mainframe programs for payroll and accounting. Instead of storing the data on punch cards mechanically, as IBM did, they stored it locally in the Electronic System while using common Logical database for all activities of Organization.
Therefore, they called their software a real-time system, since there was no need to process the punch cards overnight (for this reason their flagship product carried an R in its name until the late 1990s).
This first version was also a standalone software that could be offered to other interested parties.


2)   History:
In 1972
SAPD à System Analyse und Programmentwicklung
("System Analysis and Program Development" / "SAPD") Company is founded.
In 1973
The first financial accounting software is completed, what came to be known
as the R/1 system.
New Customers from the Local region Implement SAP Software using IBM computer
and DOS system.
In 1976
SAP GmbH à Systeme, Anwendungen und Produkte in der Datenverarbeitung ("Systems, Applications, and Products in Data Processing") Company is founded
In 1977
For the first time, SAP installs its system at customer sites outside Germany; two Austrian companies decide to implement SAP software.
In 1979
SAP/R2 is brought into the world
In 1981
The private corporation established in 1972 (Systems Analysis and Program Development) dissolved, and its rights are transferred to SAP GmbH, giving the company its current name (Systems, Applications, and Products in Data Processing)
In 1987
The standardization of software production becomes an incentive for SAP to start developing a new generation of software: SAP R/3
In 1988
SAP GmbH becomes SAP AG.
In 1992
SAP presents its R/3 system for the first time, the product meets with overwhelming approval due to its client/server concept, uniform appearance of graphical interfaces, consistent use of relational databases, and the ability to run on computers from different provider.
In 1999
SAP announces the mySAP.com strategy, mySAP.com connects e-commerce solutions with existing ERP applications using up-to-date Web technology.
In 2003
SAP announces the solution concept behind mySAPBusiness Suite. SAP introduces a new ERP solution: mySAPERP. With SAP Labs China in Shanghai, India, Japan, Israel, France, Bulgaria, Canada, and the United States.
In 2004
Enterprise services architecture delivers the first version of SAP NetWeaver.
In 2012
Since 2012, SAP has acquired several companies that sell cloud-based products.
In 2015
The company launched SAP S/4HANA.



SAP Version
Year
Architecture
SAP R/1 System RF
1972
Financial Accounting system. Runs on IBM Servers and the DOS operating system.
SAP R/2 Mainframe System
1979
Mainframe based real time data processing across accounting, manufacturing processes, supply chain logistics and human resources.
SAP R/3 Enterprise Edition 1.0 A
Jul-1992
Three tire architecture ERP Solutions, enabling SAP to be used by enterprises.
SAP R/3 Enterprise Edition 2.0
1993

SAP R/3 Enterprise Edition 3.0
1995

SAP R/3 Enterprise Edition 4.0B
Jun-1998

SAP R/3 Enterprise Edition 4.3

SAP R/3 Enterprise Edition 4.5B
Mar-1999
Client Server / mySAP
SAP R/3 Enterprise Edition 4.6C
April 2001

SAP R/3 Enterprise Edition 4.6F

SAP R/3 Enterprise Edition 4.7
2003

SAP ERP Central Component (ECC) 5.0
2004
SAP ERP constitutes the foundation of SAP's industry solutions and a spring board to enterprise SOA. It includes SAP ECC (successor of SAP R/3) and EhP
SAP ERP Central Component (ECC) 6.0
Oct-2005

SAP enhancement package 1 for SAP ERP 6.0 Business All-in-One
Dec-2006
SAP started focusing on Mid-Sized enterprises and developed this product on the same code base of SAP R/3 on SAP Netweaver platform.
SAP enhancement package 2 for SAP ERP 6.0
Jul-2007
It is designed to help businesses optimize their performance and reduce IT costs. It compresses SRM, CRM, SCM, PLM and ERP on one platform.
SAP enhancement package 5 for SAP ERP 6.0 Business Suite 7
Jun-2010

SAP enhancement package 6 for SAP ERP 6.0
Jun-2012

SAP enhancement package 7 for SAP ERP 6.0
2013

SAP S/4 Simple Suite for HANA
Feb-2015
Imagined platform that combines data processing, database and in-memory processing, provides libraries for planning, text processing, predictive, spatial and business analytics


Note :
1-   SAP ECC (ERP Central component) is the core of existing SAP Business suite.
2-   SAP Business suite has SAP ECC+SAP CRM + SAP SRM + SAP SCM + SAP PLM.
3-   SAP ECC not to be confused with SAP Business Suite.
4-   SAP ECC is part of SAP Business suite.
5-   SAP business suite can run on any DB (Oracle, MSSQL, IBM DB2) including HANA.
6-   SAP HANA is a RDBMS like Oracle, MSSQL, DB2 etc.
7-   S/4 HANA stands for SAP Business Suite 4 SAP HANA - The backend application layer runs on only HANA DB and front end will be developed with SAPUI5( Fiori). In the 3 Tier architecture of SAP system, HANA is the database layer, S/4 HANA is the application layer, Fiori is the presentation layer.S/4 HANA is called the SAP Next Gen Business Suite.Concept of SAP ECC is not here. Instead modules like Simple Finance, simple logistics etc +SAP CRM + SAP SRM + SAP SCM + SAP PLM . It is an on going project and different modules will be optimised to run exclusively on HANA.


·    Terminology
1)   ERP : Enterprise Resource Planning.
2)   SAP : System Application and Products.
3)   ECC : ERP Central Component.
4)   EHP : enhancement package for SAP.
5)   IDES : Internet Demonstration and Evaluation System.